📞 Call📅 BookEstimate
⚡ Electrical Panel Services · Jersey City, NJ

Electrical Panel Upgrade in Jersey City, NJ

Licensed 200 amp service upgrades, panel replacements, and load-capacity assessments. Permits pulled, PSE&G coordinated, inspection passed — done in a day.

💰
Panel upgrades from $1,500 – $4,000
Written quote before any work. No surprises. Financing available.
NJ Licensed & Insured
Permits Pulled
PSE&G Coordinated
4.9★ · 124 Reviews
Get a Free Estimate
We'll call you back within 2 hours — usually faster.

No spam. No obligation. We call you — you don't wait on hold.

4.9★ · 124 Google Reviews
NJ Licensed & Insured
Done in 1 Day
Do You Need an Upgrade?

8 Signs You Need a Panel Upgrade in NJ

Older homes and panels can't keep up with today's power demands — EV chargers, modern appliances, and home additions push a 100A panel past its limits.

Breakers trip frequently or won't reset
💡Lights flicker or dim when appliances run
🔥Panel feels warm or smells like burning
🚗Adding an EV charger or solar panels
🏠Home remodel adding circuits or appliances
🔌Still running on 60A or 100A service
🏦Lender or home inspector flagged the panel
📋Federal Pacific or Zinsco panel (safety hazard)
How It Works

Your Panel Upgrade, Start to Finish

We handle everything — permit filing, PSE&G coordination, installation, and inspection sign-off. You don't have to make a single call to the city or utility company.

01
Free In-Home Estimate
We visit the property, assess your current panel and load, and give you a written quote — same day.
02
Permit Pulled
We file for the electrical permit with Jersey City (or your municipality). We handle all the paperwork.
03
PSE&G Scheduled
We coordinate with PSE&G or JCPL to disconnect the meter on the day of work.
04
Upgrade Completed
New panel installed, all circuits transferred, load balanced. Typically completed in one day.
05
Inspection & Sign-Off
Municipal inspector signs off. We provide you with the permit record and completion documentation.
Ready to Get a Quote?

We'll visit the property, assess your current service, and provide a written estimate — same day.

Schedule a Free Estimate →
Real Customers · Real Results

What Jersey City Homeowners Say

Upgraded our 100A panel to 200A so we could install a Level 2 EV charger. Malfettone pulled the permit, coordinated with PSE&G, and the whole job was done in one day. Zero surprises on the price.

Tom R. · Jersey City Heights

We had a Zinsco panel that needed to go. They came out same week, gave us a written quote, and replaced it fast. Inspector signed off with no issues. Worth every penny for peace of mind.

Maria S. · Downtown JC

My lender flagged our 60-amp panel before closing. Malfettone squeezed us in quickly, handled all the paperwork with the city, and got us to 200A in time to close. Saved the deal.

Brian K. · Hoboken
Common Questions

Panel Upgrade FAQs — NJ

How much does an electrical panel upgrade cost in NJ?+
Most panel upgrades in New Jersey range from $1,500 to $4,000 depending on the existing service size, panel brand, and whether a new meter socket is required. A 100A to 200A upgrade in Jersey City typically runs $2,000–$3,200 including permits and inspection.
Do I need a permit for a panel upgrade in Jersey City, NJ?+
Yes — all panel upgrades in Jersey City require an electrical permit from the city's building department. Malfettone Electric pulls all permits on your behalf and schedules the final inspection. We handle the paperwork so you don't have to.
How long does a panel upgrade take?+
Most residential panel upgrades are completed in one day. Permit processing and inspection scheduling typically adds 1–2 weeks. We coordinate with PSE&G to reconnect service, minimizing your downtime.
When do I need a 200 amp service upgrade?+
You likely need a 200A upgrade if you're adding an EV charger, installing solar panels or a whole-home generator, remodeling a kitchen or adding a room, or if your home still has a 60A or 100A panel. It's also required by many lenders and inspectors during real estate transactions.
What is the difference between a panel upgrade and a panel replacement?+
A panel replacement swaps out a faulty or outdated panel at the same amperage. A panel upgrade increases your home's electrical capacity — most commonly from 100A to 200A. Many NJ homes built before 1980 still run on 100A service, which is insufficient for modern energy demands.
Will PSE&G need to come out for a panel upgrade?+
Yes. PSE&G (or JCPL depending on your utility) must disconnect and reconnect the meter during a panel upgrade. Malfettone Electric coordinates directly with your utility company and schedules all service connections as part of the job.
Get Started Today

Ready to Upgrade Your Electrical Panel in Jersey City?

Call or request online. We'll come out, assess your panel, and give you a written quote — same day, no obligation.

Also serving Hoboken · Bayonne · Union City · Weehawken · Secaucus — all of Hudson County, NJ